{"id":141998,"date":"2018-07-09T16:26:33","date_gmt":"2018-07-09T13:26:33","guid":{"rendered":"https:\/\/sana.sy\/en\/?p=141998"},"modified":"2018-07-10T11:08:24","modified_gmt":"2018-07-10T08:08:24","slug":"tal-qartal-power-substation-and-jandar-line-put-into-service-in-hama","status":"publish","type":"post","link":"https:\/\/archive.sana.sy\/en\/?p=141998","title":{"rendered":"Tal Qartal power substation and Jandar line put into service in Hama"},"content":{"rendered":"<p>Hama, SANA &#8211; The Tal Qartal power substation in Hama, which has a capacity of 300 MW, was put into service on Monday, along with the Hama 2 (Jandar) 400 KV power line.<\/p>\n<p>Jandar line is linked to Tal<a href=\"https:\/\/sana.sy\/en\/wp-content\/uploads\/2018\/07\/power-substation-hama-power-line.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-142000 alignright\" src=\"https:\/\/sana.sy\/en\/wp-content\/uploads\/2018\/07\/power-substation-hama-power-line-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/archive.sana.sy\/en\/wp-content\/uploads\/2018\/07\/power-substation-hama-power-line-300x200.jpg 300w, https:\/\/archive.sana.sy\/en\/wp-content\/uploads\/2018\/07\/power-substation-hama-power-line.jpg 660w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> Qartal substation and transfers electricity from the southern region to the central, northern, and coastal areas.<\/p>\n<p>Speaking to SANA\u2019s reporter, Electricity Minister Zuhair Kharbotli said that the project of the substation and the line cost more than SYP 10 billion, and that 600 Kilovolt-amps (kVA) will be transmitted via this project which will ensure stability of the power grid in the central, northern, and coastal areas.<\/p>\n<p>Manar al-Freih \/ Hazem Sabbagh<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hama, SANA &#8211; The Tal Qartal power substation in Hama, which has a capacity of 300 MW, was put into service on Monday, along with the Hama 2 (Jandar) 400 KV power line. Jandar line is linked to Tal Qartal substation and transfers electricity from the southern region to the central, northern, and coastal areas. &hellip;<\/p>\n","protected":false},"author":1,"featured_media":141999,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,122,485,510,6987,115,123,455],"tags":[729,18101,6897,18102,11081],"class_list":["post-141998","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-newscasts","category-money-and-work","category-economic","category-hama","category-latest-news","category-local","category-news-money-and-work","category-governorates-news","tag-electricity","tag-electricity-minister-zuhair-kharbotli","tag-hama","tag-hama-2-jandar-400-kv-power-line","tag-power-substation"],"_links":{"self":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/141998"}],"collection":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=141998"}],"version-history":[{"count":0,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/141998\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/media\/141999"}],"wp:attachment":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=141998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=141998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=141998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}