{"id":216825,"date":"2021-01-08T12:04:17","date_gmt":"2021-01-08T10:04:17","guid":{"rendered":"http:\/\/107.6.182.27\/en\/?p=216825"},"modified":"2021-01-08T17:20:27","modified_gmt":"2021-01-08T15:20:27","slug":"turkish-occupation-and-its-mercenaries-attack-power-station-in-tal-tamer-and-3-lines-go-out-of-service","status":"publish","type":"post","link":"https:\/\/archive.sana.sy\/en\/?p=216825","title":{"rendered":"Turkish occupation and its mercenaries attack power station in Tal Tamer and 3 lines go out of service\u00a0"},"content":{"rendered":"<p style=\"text-align: justify;\">Hasaka, SANA \u2013The Turkish occupation forces and their terrorist mercenaries renewed their aggression on power station in Tal Tamer in Hasaka northwestern countryside, which caused the exit of 3 \/20 kv high voltage lines 20 K 0 F from the service.<\/p>\n<p style=\"text-align: justify;\">Director of Hasaka Electrical Company, Anour Aukla told SANA reporter that the Turkish occupation forces and their terrorist mercenaries renewed on Friday their attack with artillery shells on Tal Tamer power station 20\/66 kv, which caused the exit of 3\/ 20 KV high voltage lines feeding of Tal Tamer city and its surroundings.<\/p>\n<p style=\"text-align: justify;\">He added that the electric supply was disconnected until shelling stop, provided that the damaged lines were to be repaired as soon as the entry was possible and the missiles stopped.<\/p>\n<p style=\"text-align: justify;\">Turkish occupation troops and their mercenaries deployed in Ras al-Ain city and its countryside have repeatedly targeted the infrastructure and service facilities in the northern and western countryside of the province ,with the aim of \u00a0displacing citizens from their houses\u00a0 and lands in order to replacing them with the terrorist families.<\/p>\n<p style=\"text-align: justify;\">Hybah \/ Mazen<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hasaka, SANA \u2013The Turkish occupation forces and their terrorist mercenaries renewed their aggression on power station in Tal Tamer in Hasaka northwestern countryside, which caused the exit of 3 \/20 kv high voltage lines 20 K 0 F from the service. Director of Hasaka Electrical Company, Anour Aukla told SANA reporter that the Turkish occupation &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[115],"tags":[],"class_list":["post-216825","post","type-post","status-publish","format-standard","","category-local"],"_links":{"self":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/216825"}],"collection":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=216825"}],"version-history":[{"count":0,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/216825\/revisions"}],"wp:attachment":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=216825"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=216825"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=216825"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}