{"id":221968,"date":"2021-02-12T17:42:48","date_gmt":"2021-02-12T15:42:48","guid":{"rendered":"http:\/\/107.6.182.27\/en\/?p=221968"},"modified":"2021-02-12T17:42:48","modified_gmt":"2021-02-12T15:42:48","slug":"hasaka-electricity-mends-zarkan-power-line-in-tal-tamer","status":"publish","type":"post","link":"https:\/\/archive.sana.sy\/en\/?p=221968","title":{"rendered":"Hasaka electricity mends Zarkan power line in Tal Tamer"},"content":{"rendered":"<p style=\"text-align: justify;\">Hasaka, SANA \u2013The maintenance teams at Hasaka General Electricity Company have mended Zarkan electric power line of 20 KF in the northwestern countryside.<\/p>\n<p style=\"text-align: justify;\">The line came out of service by the latest shelling of Turkish occupation forces and its terrorist mercenaries.<\/p>\n<p style=\"text-align: justify;\">Director of Hasaka Electricity, Anwar Ukla told SANA reporter that the power line, which runs from Tal Tamer power transmission station, and feeds several villages and residential gatherings in the northern countryside of Tal Tamer town, was completely repaired.<\/p>\n<div id='gallery-1' class='gallery galleryid-221968 gallery-columns-2 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"209\" src=\"https:\/\/archive.sana.sy\/en\/wp-content\/uploads\/2021\/02\/22-5.jpg\" class=\"attachment-full size-full\" alt=\"\" \/>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"196\" src=\"https:\/\/archive.sana.sy\/en\/wp-content\/uploads\/2021\/02\/33-5.jpg\" class=\"attachment-full size-full\" alt=\"\" \/>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n<p>Hybah \/ Mazen<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hasaka, SANA \u2013The maintenance teams at Hasaka General Electricity Company have mended Zarkan electric power line of 20 KF in the northwestern countryside. The line came out of service by the latest shelling of Turkish occupation forces and its terrorist mercenaries. Director of Hasaka Electricity, Anwar Ukla told SANA reporter that the power line, which &hellip;<\/p>\n","protected":false},"author":1,"featured_media":221971,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[507,115,455],"tags":[],"class_list":["post-221968","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-hasaka","category-local","category-governorates-news"],"_links":{"self":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/221968"}],"collection":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=221968"}],"version-history":[{"count":0,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/221968\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/media\/221971"}],"wp:attachment":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=221968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=221968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=221968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}