{"id":79749,"date":"2016-06-09T17:00:33","date_gmt":"2016-06-09T14:00:33","guid":{"rendered":"http:\/\/sana.sy\/en\/?p=79749"},"modified":"2016-06-09T17:00:33","modified_gmt":"2016-06-09T14:00:33","slug":"electricity-back-to-hasaka-after-4-day-outage","status":"publish","type":"post","link":"https:\/\/archive.sana.sy\/en\/?p=79749","title":{"rendered":"Electricity back to Hasaka after 4-day outage"},"content":{"rendered":"<p>Hasaka, SANA &#8211; Electric power returned to the northeastern Hasaka province on Thursday after a 4-day outage caused due to a technical failure at the station of Tishreen Dam.<\/p>\n<p>Head of Power Transfer Department in Hasaka Ghassan Darwish said in a statement to SANA reporter that electricity was back after repairing the technical failure at the station by the maintenance teams, affirming that the power supply in the province is stable.<\/p>\n<p>Darwish noted that the technical teams are currently working on repairing line 66 that links the main station and al-Shaddadi city which was damaged due to terrorist attacks, in order to re-supply Hasaka southern areas with electricity.<\/p>\n<p>He added that a part of the main station in Hasaka has already been fixed and that work is underway to complete the repair.<\/p>\n<p>Qabas\/ H. Said<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hasaka, SANA &#8211; Electric power returned to the northeastern Hasaka province on Thursday after a 4-day outage caused due to a technical failure at the station of Tishreen Dam. Head of Power Transfer Department in Hasaka Ghassan Darwish said in a statement to SANA reporter that electricity was back after repairing the technical failure at &hellip;<\/p>\n","protected":false},"author":1,"featured_media":79750,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6987,115,116],"tags":[9604,729,6894,758],"class_list":["post-79749","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-latest-news","category-local","category-news-locals","tag-back","tag-electricity","tag-hasaka","tag-outage"],"_links":{"self":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/79749"}],"collection":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79749"}],"version-history":[{"count":0,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/posts\/79749\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=\/wp\/v2\/media\/79750"}],"wp:attachment":[{"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=79749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.sana.sy\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=79749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}