{"id":129899,"date":"2020-02-08T13:10:01","date_gmt":"2020-02-08T11:10:01","guid":{"rendered":"http:\/\/sana.sy\/es\/?p=129899"},"modified":"2020-02-08T13:11:57","modified_gmt":"2020-02-08T11:11:57","slug":"continuan-obras-de-rehabilitacion-de-la-red-electrica-en-deraa","status":"publish","type":"post","link":"https:\/\/archive.sana.sy\/es\/?p=129899","title":{"rendered":"Contin\u00faan obras de rehabilitaci\u00f3n de la red el\u00e9ctrica en Deraa"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong><span lang=\"ES-TRAD\" style=\"color: #800000;\">Deraa, SANA<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><span lang=\"ES-TRAD\">Los equipos t\u00e9cnicos de la Empresa Estatal de Electricidad en la provincia de Deraa, a unos 101 km al sur de la capital Damasco, contin\u00faan las obras de rehabilitaci\u00f3n de las redes el\u00e9ctricas da\u00f1adas por el terrorismo.<\/span><\/p>\n<p style=\"text-align: justify;\"><span lang=\"ES-TRAD\">La rehabilitaci\u00f3n forma parte de un plan para restablecer el sistema el\u00e9ctrico en todas las zonas de Deraa y otras provincias del pa\u00eds.<\/span><\/p>\n<p style=\"text-align: justify;\"><span lang=\"ES-TRAD\">Ghassan Al-Zamel, el gerente de la Empresa, declar\u00f3 a SANA que los electricistas instalaron l\u00edneas el\u00e9ctricas de casi 25 kil\u00f3metros de largo y 19 transformadores de diversa capacidad, en el barrio Deraa al-Balad de la cabecera provincial.<\/span><\/p>\n<p style=\"text-align: justify;\"><span lang=\"ES-TRAD\">Anteriormente, los trabajadores de la Empresa Estatal El\u00e9ctrica en Deraa restablecieron el servicio de electricidad en m\u00e1s de 134 poblados.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\"><strong>A. H.\/ F. M.<\/strong><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deraa, SANA Los equipos t\u00e9cnicos de la Empresa Estatal de Electricidad en la provincia de Deraa, a unos 101 km al sur de la capital Damasco, contin\u00faan las obras de rehabilitaci\u00f3n de las redes el\u00e9ctricas da\u00f1adas por el terrorismo. La rehabilitaci\u00f3n forma parte de un plan para restablecer el sistema el\u00e9ctrico en todas las zonas &hellip;<\/p>\n","protected":false},"author":30,"featured_media":129903,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[597,476],"tags":[17484],"class_list":["post-129899","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-cinta-de-noticias","category-locales","tag-continuan-obras-de-rehabilitacion-de-la-red-electrica-en-deraa"],"_links":{"self":[{"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=\/wp\/v2\/posts\/129899"}],"collection":[{"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=129899"}],"version-history":[{"count":0,"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=\/wp\/v2\/posts\/129899\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=\/wp\/v2\/media\/129903"}],"wp:attachment":[{"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=129899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=129899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.sana.sy\/es\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=129899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}