{"id":173083,"date":"2019-01-29T22:53:58","date_gmt":"2019-01-29T20:53:58","guid":{"rendered":"http:\/\/www.sana.sy\/tr\/?p=173083"},"modified":"2019-01-30T14:05:25","modified_gmt":"2019-01-30T12:05:25","slug":"cumhurbaskani-esadin-himayesinde-lazkiyede-526-mwlik-uretim-istasyonunun-temel-tasi-atildi","status":"publish","type":"post","link":"https:\/\/archive.sana.sy\/tr\/?p=173083","title":{"rendered":"526 MW&#8217;l\u0131k \u0130stasyonun Temel Ta\u015f\u0131 At\u0131ld\u0131"},"content":{"rendered":"\n<p>LAZK\u0130YE \u2013 Cumhurba\u015fkan\u0131 Be\u015f\u015far Esad&#8217;\u0131n g\u00f6zetiminde bug\u00fcn Lazkiye&#8217;de 16 Ekim Baraj\u0131 paralelindeki Rastin K\u00f6y\u00fcnde Elektirk Bakan\u0131 Muhammed Z\u00fcheyr Harbutlu ile \u0130ran Enerji Bakan\u0131 R\u0131da Ardakanyan&#8217;\u0131n huzurunda Lazkiye Elektrik Santrali Projesinin temel ta\u015f\u0131 at\u0131ld\u0131. <\/p>\n\n\n\n<p>526 mega wat kapasiteye sahip istasyon projesinin maliyeti 213 milyar Suriye liras\u0131na ula\u015f\u0131yor.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/93-1024x683.jpg\" alt=\"\" class=\"wp-image-173085\" width=\"321\" height=\"213\" srcset=\"https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/93-1024x683.jpg 1024w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/93-150x100.jpg 150w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/93-300x200.jpg 300w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/93-768x512.jpg 768w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/93-310x205.jpg 310w\" sizes=\"auto, (max-width: 321px) 100vw, 321px\" \/><\/figure><\/div>\n\n\n\n<p>\u0130ran Enerji Bakan\u0131  <br>Ardakanyan bas\u0131n toplant\u0131s\u0131nda santralin, \u0130ran&#8217;\u0131n Suriye&#8217;de yeniden yap\u0131lanma a\u015famas\u0131na kat\u0131l\u0131m\u0131 \u00e7er\u00e7evesinde ilk kalk\u0131nsal projesi olaca\u011f\u0131n\u0131 s\u00f6yledi. Ardakanyan \u0130ran m\u00fchendislik firmalar\u0131n\u0131n iki \u00fclke aras\u0131ndaki uzun vadeli stratejik anla\u015fma kapsam\u0131nda ba\u015fka projeler uygulamaya haz\u0131r olduklar\u0131n\u0131 belirtti.<\/p>\n\n\n\n<p>Bakan Harbutlu ise bas\u0131n a\u00e7\u0131klamalar\u0131nda; santral projesinin 3 y\u0131l i\u00e7inde tamamlanaca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.  Harbutlu Projenin sahil b\u00f6lgesi ba\u015fta olmak \u00fczere genel olarak t\u00fcm Suriye&#8217;de elektrik enerjisi hizmetini iyile\u015ftirece\u011fini kaydetti. Devletin elektrik enerjisi \u00fcretim kapasitesini sava\u015ftan \u00f6nceki haline getirmeye \u00e7aba harcad\u0131\u011f\u0131n\u0131 belirten Harbutlu; Bakanl\u0131\u011f\u0131n \u00e7al\u0131\u015fma stratejisi ve \u00f6nceliklerinde buna b\u00fcy\u00fck \u00f6nem verdi\u011fini s\u00f6yledi. Bakan Harbutlu elektrik enerjisinin \u00fcretim, sanayi ve bir\u00e7ok sekt\u00f6rde ta\u015f\u0131d\u0131\u011f\u0131 \u00f6neme vurgu yapt\u0131.<\/p>\n\n\n\n<p>Halep santralindeki birinci ve be\u015finci \u00fcnitelerin yeniden \u0131slah\u0131 ile Banyas&#8217;taki gaz \u00fcnitesinin geni\u015fletilmesi \u00e7abalar\u0131na dikkat \u00e7eken Bakan Harbutlu; \u00fcretim alan\u0131ndaki stratejik projelerin uygulanmas\u0131 i\u00e7in \u0130ran taraf\u0131yla yap\u0131lan proje ve anla\u015fmalara i\u015faret etti.<\/p>\n\n\n\n<p>Elektrik Kamu Kurumu M\u00fchendisi Mahmud Ramazan ise bas\u0131n a\u00e7\u0131klamalar\u0131nda; \u00fcretim istasyonunun sadece do\u011falgaz ile \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 s\u00f6yledi. <\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/95-1024x683.jpg\" alt=\"\" data-id=\"173086\" data-link=\"https:\/\/www.sana.sy\/tr\/?attachment_id=173086\" class=\"wp-image-173086\" srcset=\"https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/95-1024x683.jpg 1024w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/95-150x100.jpg 150w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/95-300x200.jpg 300w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/95-768x512.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/94-1024x683.jpg\" alt=\"\" data-id=\"173087\" data-link=\"https:\/\/www.sana.sy\/tr\/?attachment_id=173087\" class=\"wp-image-173087\" srcset=\"https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/94-1024x683.jpg 1024w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/94-150x100.jpg 150w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/94-300x200.jpg 300w, https:\/\/archive.sana.sy\/tr\/wp-content\/uploads\/2019\/01\/94-768x512.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>LAZK\u0130YE \u2013 Cumhurba\u015fkan\u0131 Be\u015f\u015far Esad&#8217;\u0131n g\u00f6zetiminde bug\u00fcn Lazkiye&#8217;de 16 Ekim Baraj\u0131 paralelindeki Rastin K\u00f6y\u00fcnde Elektirk Bakan\u0131 Muhammed Z\u00fcheyr Harbutlu ile \u0130ran Enerji Bakan\u0131 R\u0131da Ardakanyan&#8217;\u0131n huzurunda Lazkiye Elektrik Santrali Projesinin temel ta\u015f\u0131 at\u0131ld\u0131. 526 mega wat kapasiteye sahip istasyon projesinin maliyeti 213 milyar Suriye liras\u0131na ula\u015f\u0131yor. \u0130ran Enerji Bakan\u0131 Ardakanyan bas\u0131n toplant\u0131s\u0131nda santralin, \u0130ran&#8217;\u0131n Suriye&#8217;de &hellip;<\/p>\n","protected":false},"author":1,"featured_media":173084,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[485,596,486,479,17988,478],"tags":[],"class_list":["post-173083","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-is-ve-sermaye","category-fotografli-raporlar","category-haberler-is-ve-sermaye","category-haberler-yerel","category-son-haberler","category-yerel"],"_links":{"self":[{"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=\/wp\/v2\/posts\/173083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=173083"}],"version-history":[{"count":0,"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=\/wp\/v2\/posts\/173083\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=\/wp\/v2\/media\/173084"}],"wp:attachment":[{"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=173083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=173083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.sana.sy\/tr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=173083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}